Curtain Wall Testing » Curtain Wall Laboratory Testing

Curtain Wall Laboratory Testing

Curtain Wall Testing, also called Mock-Up Testing, was pioneered by Sak Sakhnovsky from the University of Miami in the 1950s. The Laboratory provides a structure to which the curtain wall contractor fixes his specimen which is then enclosed to form an air-tight chamber. Mock-Ups are usually at least three modules wide and two stories high, but can be much bigger, and they must include movement joints. Besides the basic tests of Air Infiltration, Static Water Penetration and Structural Load, there are a number of other procedures and tests designed to verify the performance of the wall in accordance with the specified standards.

Laboratory Testing verifies that the design of the proposed system is capable, when assembled under ideal conditions in the laboratory, of meeting the design criteria.  It also shows the contractor’s team where the critical details are and the importance of the workmanship. Every large Job should be tested whether or not the system has been tested before; every job is different, the installers have to know that quality is important to the client’s team, and there is just too much at stake to simply assume or hope it will be ok.

Our laboratory can accommodate up to 10 different mock-ups and or very large mock-ups (widths of 15 m and a height of 18m have been tested) and very high pressures. We are accredited by both UKAS and ENAS to ISO 17025 (the ISO 9000 of the laboratory world) and our results are therefore universally acceptable. The lab is managed by our Curtain Wall Testing Manager, Clarence Facun, who has been with us since 2003; he and his team of engineers and technicians have conducted literally hundreds of tests.

More Details

Facade Consulting

Resistance to Fire Testing

Reaction to Fire Testing

 

Contact our Projects Department for More Information »

 
 
credentials image
credentials image
credentials image
credentials image
credentials image